Our Experience
Gas Pipelines
During the years 2016-2018, Geokos A&A has been responsible for CPTu testing in the TAP (Trans Adriatic Pipeline) project in Albania. The most modern geotechnical testing, CPTu was performed at the pumping stations in Fier, at a depth of 50m from the ground surface.
In addition to deep testing, CPTu was also used to investigate the entire gas pipeline, starting at the border with Greece in Kapshtica, until the exit of the Adriatic Sea in Fier (about 120 km long).
During 2021, geotechnical testing was also carried out for the Fier-Vlora Gas Pipeline with the CPTu equipment, where the soil lithology data were obtained in real time to speed up the design process.
Leave a Comment